HomeElectronicsAccessories & SuppliesAudio & Video AccessoriesCablesHDMI Cables30M HDMI High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black
product_image_name-Cable-30M HDMI High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black-1

Share this product

Cable 30M HDMI High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

UGX 145,598
UGX 150,0123%

2 units left

+ shipping from UGX 3,000 to Central Business District
Variation available

Promotions

Delivery & Returns

Choose your location

Pickup Station

Delivery Fees UGX 3,000
Ready for pickup between 30 March and 01 April if you place your order within the next 13hrs 35mins

Door Delivery

Delivery Fees UGX 4,600
Ready for delivery between 30 March and 01 April if you place your order within the next 13hrs 35mins

Return Policy

Free return within 7 days for eligible items.Details

Seller Information

Bonic cctv

100%Seller Score

33 Followers

Follow

Seller Performance

Shipping speed: Excellent

Quality Score: Excellent

Product details

High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel), This HDMI cables are made to the highest standards and featuring copper cable and double shielding to ensure smooth data transmission with no interference. Good for long for extending your HDMI signal to other areas of the home or office. With a durable PVC jacket for easy routing in challenging areas compatible with a range of devices that support HDMI. A perfect match for Cctv, Free view/Free sat and HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors.

Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths

Specifications

Key Features

  • Compatible with any device with a HDMI port.
  • High-speed networking to an HDMI link, allowing users to take full advantage of their IP-enabled devices without a separate Ethernet cable.
  • Allows an HDMI-connected TV with a built-in tuner to send audio data "upstream" to a surround audio system, eliminating the need for a separate audio cable.
  • Defines input/output protocols for major 3D video formats, paving the way for true 3D gaming and 3D home theatre applications.
  • Real-time signaling of content types between display and source devices, enabling a TV to optimize picture settings based on content type
  •  Adds support for additional color models used in digital photography and computer graphics.
  • Affordable

What’s in the box

1 * x 30m HDMI cable

Specifications

  • SKU: CA246EA0V9RHLNAFAMZ
  • Product Line: 1
  • Model: 1080p
  • Production Country: China
  • Size (L x W x H cm): 30
  • Weight (kg): 2
  • Certifications: Eco Friendly
  • Color: Black
  • Main Material: Copper
  • Shop Type: Jumia Mall

Customer Feedback

See All

Verified Ratings (1)

1/5
1 out of 5

1 verified rating

Product Reviews (0)

This product has no reviews yet.

Cable 30M HDMI High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

Cable 30M HDMI High Speed Long Lead Full HD 1080P Tv Laptop PC Monitor Cctv-Black

UGX 145,598
UGX 150,0123%
Questions about this product?

Recently Viewed

See All